Toggle search
Search
Toggle menu
Toggle personal menu
Editing
Guides/Power and Energy Costs
(section)
From Desynced Wiki
Read
Edit
Edit source
View history
Page
Discussion
More actions
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
===== Mobile Power: Unorthodox (range-limited) options ===== Extension Cords: There are blueprints on the discord for {{IL|Worker}}s with {{IL|Small Power Field}}s and a {{IL|Behavior Controller}} instructing them to form a chain to the target. This chain can transmit infinite power but gets more expensive with distance. The break even point with power transmitters is around 0.86 tiles per unit power transmitted (wind grid) and 1.2 tiles per unit power transmitted (blight grid). Battery Running: A loop of {{IL|Worker}}s with {{IL|Small Battery}}s and {{IL|Behavior Controller}}s is theoretically competitive with power transmitters for distances of up to 1900 tiles (depending on how grid power is generated). However, there are not currently any behaviors available for automating this. [[Category:Guides]]
Summary:
Please note that all contributions to Desynced Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Desynced Wiki:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)